01698 337 285
Recent Work

Network Rail, Glasgow

Joinery Only Fit Out

Joinery only fit out of eight floors at 155 St Vincent St, Glasgow to form offices throughout using Komfort single glazed Polar partition systems including glass doors.

Value: £120,000
Programme: 10 weeks

Best Invest, Liverpool

Refurbishment and Fit Out

Refurbishment and fit out of 12,000sqft within the Liver Building one of the most prestigious buildings in the UK. This involved the strip out of all ceilings, partitions and raised access floors to form an empty shell. This was then fitted out using new raised access floors, glazed partitions, new ceilings, kitchens, lighting and full AC throughout including full decoration and new carpets throughout.

Value: £400,000
Programme: 12 weeks

Recent Work
Recent Work

Nike, Manchester

Fit Out

The purpose of this project was the fit out of an existing empty retail unit into a Nike Factory Store this  included various alterations to the existing layout, including wall linings, new stud partitions, lighting, flooring, decoration, fitting rooms, back of house rooms, signage, shop fittings, etc.

In addition to the above, the installation of new ventilation, air-conditioning and electrical installations including new lighting throughout.

Value: £400,000
Programme: 8 weeks

Arnold Clark, Seat, Seafield

Refurbishment Works

Refurbishment of existing showroom to provide modern car showroom including new ceilings, lighting and floor tiling throughout. External decoration, etc. Contract was undertaken and completed on time and to a high quality to the delight of Arnold Clark.

Value: £120,000
Programme: 7 weeks

Recent Work
Recent Work

Hockey Pavilion

Joinery Only Fit Out

Joinery only new build to provide a new Hockey Pavilion including showers, toilets and changing rooms for Edinburgh Academy.

Value: £100,000
Programme: 12 weeks

5th Floor, 150 St Vincent Street, Glasgow

Irwin Mitchell Solicitors Fit Out

The works involved the installation of Komfort Polar 100 double glazed and solid partitions to form new meeting rooms, boardroom, tea-preps, comms room, etc. New feature ceilings, sliding/folding partitions and bespoke furniture were installed to a high standard and quality.

New electrical works included underfloor busbar system and floor-boxes to meet furniture layout requirements. This also included the installation of feature and general lighting throughout the floor space.

All areas were re-decorated and new carpets and vinyl installed.

This contract was completed on-time and to the complete satisfaction of the Client.

Value: £200,000

Recent Work
Recent Work

Arnold Clark, Livingston

Refurbishment Works

Refurbishment of existing showroom to provide modern car showroom including new ceilings,  lighting and floor tiling throughout. The showroom remained in operation throughout the project which was undertaken in two phases.

Value: £160,000
Programme: 7 weeks

Newarthill Parish Church, Newarthill

Church Hall and Vestry Refurbishment

The works involved the strip out of the existing ceilings, wall linings, windows, floors, heating and lighting throughout the vestry and chancel areas. The asbestos was also removed from the plantroom.

New insulated wall linings and mf ceilings, double-glazed windows, new heating system with radiators throughout were re-installed. The lighting design was undertaken directly by the Church of Scotland and installation completed during the refurbishment works.

Full decoration and carpets were installed throughout.

This contract was completed early to enable the church full access to use the vestry.

Value: £120,000

Recent Work

Client Testimonials

"SAS Contracts carried out a first class refurbishment of the Sanctuary within Newarthill Parish Church of Scotland. From the costing to the completion of the work, the professional attitude of the staff and employees could not be faulted. The overriding priority whilst carrying out the work was the requirement of the client - to achieve the best quality and standard of workmanship within the very tight budget that we had. Where improvements to the original concept and design could be made, SAS Contracts endeavoured to engage and support these, particularly where savings could be made or better quality materials introduced. All the work was completed to a very high standard with particular attention to detailed finishings as can be seen from the photos of the completed work."

Alan Dick, Church Treasurer — Newarthill Parish Church of Scotland